Rehabilitation Of Ballsh – Fier National Railway

Project Description
The first phase of works for the Ballsh-Fier-Vlora national railway project consisted of the construction of 34 km of the existing Fier-Vlora railway line, including the construction of a new 2.5 km railway line for the Fier refinery. Part of the project has also included the construction of lines for 3 railway stations, Fier, Levan and Novosela, including the reconstruction of 26 railway crossings.
This phase of work has consisted in improving the existing rail transport system, depreciated over the last two decades. The final works were carried out with a special leveling machine, which carried the whole line behavior within the project parameters both in axis and in quota.
The next phases of this investment are expected to have a positive and developmental approach to domestic rail systems, which will increase the quality of service to meet market demands for this type of transport in the coming decades.
Complete reconfiguration of the existing highly degraded railway network to enable efficient engineering solutions, in view of the problems encountered during project implementation.



Other Project
Rehabilitation of the Water Supply System of Berat and Kuçova
Water Supply & Sewer Systems
Environmental Protection of Lake Ohrid
Environmental Protection
Reconception of Fier City Center
Civil Constructions
Construction of Access Roads for the Trans Adriatic Pipeline
Road & Railway Infrastructure
Construction of Metal Structures and Installation of Steel Pipelines
Infrastructure
Civil Construction And Services In The Oil And Gas Industry
Infrastructure
Rehabilitation Of Ballsh – Fier National Railway
Road & Railway Infrastructure
National Arena Stadium
Civil Constructions
Reconstruction and Restoration of 68 buildings in the Historical Center of the city of Vlora
Architectural Restoration