Civil Works for Construction of Access Road, Small Structures, Bridge and Square for Molisht-1 Drilling Well, Block 2-3 for Oil and Natural Gas Exploration Activities in Albanian soil, funded by Petromans Albania GmbH and SHELL in the Region BERAT.
Start Date: 17.06.2013
Completed: 29.08.2013
Successful project of constructing the connecting road between the two Shpirag-2 and Shpirag-3 drilling sites, in the framework of investments undertaken by the company SHELL Upstream Albania BV, the subsidiary of Royal Dutch SHELL in Albania, for oil exploration in the area of Shpirag Block 2-3.
The road has been thoroughly built on a new track and completed within accelerated timelines. Within 42 days, about 15,000 m2 of drilling rigs and 15 km of access road with stabilizer have been laid to enable the passage of heavy drilling rigs for oil and gas exploration.
The entire project including the finalization of the bridge was completed in 76 days.